High Voltage & Extra High Voltage Cables

Product Range
  1. Single Core Copper Conductor, XLPE Insulated Copper Wire Screen and HDPE Sheath (Cu/XLPE/CW/HDPE)

    Description
    Stranded circular or segmental compacted copper conductor, semi-conducting layer as conductor screen, XLPE insulated, semi-conducting layer as non-metallic insulation screen. With semi-conductive water blocking tape and copper wire as metallic insulation screen to withstand the required earth fault current. Non-conductive water blocking tape to protect the screen area from longitudinal water penetration, copolymer aluminum tape to protect the cable from radial water penetration and HDPE sheathed with graphite coating or extruded semi-conducting l ayer. Designed and tested to comply with IEC 60228, 60840 and 60811 Range: 26 /45 (52) kV - 38/66 (72.5) kV - 76/132 (145) kV - 127/220 (245) kV 
  1. Single core Copper conductor, XLPE insulated Lead Sheathed and HDPE sheath (Cu/XLPE/Lead/HDPE)

    Description
    Stranded circular or segmental compacted copper conductor, semi-conducting layer as conductor screen, XLPE insulated, semi-conducting layer as non-metallic insulation screen. With semi conductive water blocking tape to protect the screen area from longitudinal water penetration, lead sheathed with suitable thickness to withstand the required earth fault current and HDPE sheathed with graphite coating or extruded semi-conducting layer. Designedand tested to comply with IEC 60228, 60840 and 60811. Range: 38/66 (72.5) kV – 76/132 (145) kV - 127/220 (245) kV 

Certification

Projects

Powering the new administrative capital with EHV cables – a first for Egypt

As part of Egypt's 2030 vision plan to develop a competitive, balanced and diversified economy, Elsewedy Electric has contracted with the Ministry of Defense to execute the prestigious new capital tunnel project. The project includes engineering, design, fabrication, site testing and commissioning to connect the main three substations of the new administrative capital - a total route length of 17 kms.  

The work will proceed in 8 stages: 

  1. Coring stage
  • Preparation work for the steel structure 
  1. Steel structure installation
  • Hot-dip galvanized steel structure fixed to the wall to hold 1 x 2000 mm2 power cables 
  1. Scaffolding
  • Construct a platform to support the cable laying process H: 3.5 meters, W: 1.8 meters, L: 8 kms
  1. Cable laying
  • 107 kms of power cables laid inside tunnels by an innovative conveying machine system
  • Power cable sagging
  • We will ensure vertical sag of cables to adapt to thermal expansion and axial force 
  • Power cable fixing
  • JGP 8 clamps fix the trefoil cables to restrain electromagnetic forces
  1. Jointing
  • Connecting the two sections of the cables
  1. Fiber optic cables
  • For the substations to communicate
  1. Distribution thermal system DTS
  2. Fire coating process
  • Followed by the termination process inside substation

As part of our commitment to the safety of contractors and employees, we adhere to the highest international health, safety & environmental (HSE) regulations (OSHA, EN, BS & NFPA). All employees are drilled to understand their roles in case of an emergency.

With passion, will, innovation, clear vision and a hardworking team, Elsewedy Electric has reached the pinnacle of success to become a global leader in cables manufacturing and a regional leader in energy solutions and related services. And our success story continues as we shape the future of energy and empower a better world.

 

An EGP 1.2 billion project to upgrade the Cairo Regional Control Center

Using technologies from around the world, Elsewedy Cables will upgrade the Cairo Regional Control Center on a turnkey basis. As part of a consortium with NARI Group Corporation, Huawei International Ltd and Huawei Technologies (Egypt) Ltd, we signed a contract with the Egyptian Electricity Transmission Company (EETC) to deliver the project in just 20 months. The project is valued at EGP 1.2 billion, with EGP 583.7 million allocated to Egytech.

Connection of Almaza & El Matar 220/66/11kV substations


Date: 2015
Client: MAJID ALFUTTAIM
Role: Sub-contractor
Duration: 8 months
Design, engineering, manufacturing, testing, delivery and installation (DEMTDI) on turnkey basis of 66 kV, XLPE 1x800 mm2 copper cables & accessories

Connection of Metro Ramsis & Stadium substations

Date: 2016
Client: EETC 
Role: Contractor
Duration: 8 months
DEMTDI on turnkey basis of 220 KV, XLPE 1x1600 mm2 Copper cables with its accessories for connecting Metro Ramsis S/S / Stadium S/S.

Connection of Sakr Koriesh & Gardinia substations, Sakr Koriesh & Badr substations, airport 220/66/11 kV & New Cairo, Sakr Koriesh & airport

Date: 2018
Client: Armed Forces Engineer Authority
Role: Contractor
Duration: 8 months
DEMTDI on turnkey basis of 220 KV, XLPE 1x2000mm2 & 1x1600 mm2 copper cables & accessories.

Connection of East Cairo & Gardinia substations

Date: 2019
Client: EETC
Role: Contractor
Duration: 3 months
DEMTDI on turnkey basis of 220 KV, XLPE 1x1600 mm2 copper cables & accessories. 

Connection of El Maadi substation to the switching station

Date: 2015
Client: EETC
Role: Contractor
Duration: 10 months
DEMTDI on turnkey basis of 220 kV, XLPE 1x1600 mm2 copper cables with its accessories for connecting El Maadi S/S to the switching station.

 

Connection of Hadaba (2) substation to Cairo 500 s/s

Date: 2015
Client: EETC
Role: Contractor
Duration: 10 months
DEMTDI on turnkey basis of 220 kV, XLPE 1 x 2000 mm2 copper cables with accessories

Connection of Imbaba substation in the Direction of Cairo West s/s

Date: 2016
Client: EETC
Role: Contractor
Duration: 6 months
DEMTDI on turnkey basis of 220 kV, XLPE 1 x 2000 mm2 copper cables with accessories

Connection of Talkha & Meet El Sarem substations

Date: 2016
Client: EETC
Role: Contractor
Duration: 9 months
DEMTDI on turnkey basis of 66 kV, XLPE 1 x 630 mm2 copper cables with accessories

Connection of Imbaba & Moatemidia substations

Date: 2018
Client: EETC
Role: Contractor
Duration: 8 months
DEMTDI on turnkey basis of 220 kV, XLPE 1 x 1600 mm2 copper cables with accessories

Connection of Zahraa El Maadi substation to the national network

Date: 2018
Client: EETC
Role: Contractor
Duration: 5 months
DEMTDI on turnkey basis of 220 kV, XLPE 1 x 1600 mm2 copper cables with accessories

Connection of El Narges substation to the switching station

Date: 2018
Client: EETC
Role: Contractor
Duration: 8 months
DEMTDI on turnkey basis of 220 kV, XLPE 1 x 1600 mm2 copper cables with accessories

Supply of Extra High Voltage Cables 220 kV 1c 2500 mm² - Cu/XLPE/Lead/HDPE for 6th of October 500/220/22 KV GIS Project

Date: 2018
Client: Madkour
Role: Sub-contractor
Duration: 5 months

Supply of Extra High Voltage Cables 220 kV 1c 2000 mm² - Cu/XLPE/Lead/HDPE

Date: 2018
Client: GE Grid Solutions
Role: Sub-contractor
Duration: 2 months

Connection of 15 May 220/66 kV substation to the national network

Date: 2019
Client: EETC
Role: Contractor
Duration: 3 months
DEMTDI on turnkey basis of 66kV, XLPE 1 x 800 mm2 copper cables with accessories

 

Connection of Basateen substation to the national network

Date: 2019
Client: EETC
Role: Contractor
Duration: 3 months
DEMTDI on turnkey basis of 66kV, XLPE 1 x 400 & 1 x 800 mm2 copper cables with accessories