KSA

Elsewedy Electric is a strategic partner in realizing the Kingdom of Saudi Arabia’s ambitious Vision 2030. Our deep-rooted commitment to energy, infrastructure, and digital solutions aligns perfectly with the Kingdom’s aspirations for a sustainable and prosperous future. With over 85 years of global experience, we offer a comprehensive range of solutions to support the nation’s goals.

 

  • Cables

Our state-of-the-art Yanbu factory boasts an annual production capacity of over 45,000 tons, catering to diverse market needs. 

Our comprehensive cable portfolio includes:

·         Indoor Wires

·         Low Voltage Cables 

·         Medium and High Voltage Cables 

 

 

  • Cable Accessories

Complementing our cable offerings, Elsewedy Electric produces a wide range of cable accessories at our Riyadh facility. Our comprehensive product line includes:

·         MV Premolded Cable Accessories up to 36 KV

·         LV Heat Shrink Cable Joint & Terminations up to 1.2 KV

·         Heat Shrink Accessories (End Cab, Boots, Breakouts)

·         LV & MV Cable Lugs and Connectors (Copper & Aluminum & Bi-metallic)

·         Overhead Line Polymeric Insulators

·         Polymeric Insulators

·         Link box up to 400 KV

 

 

  • Transformers:

Our transformer portfolio includes:

·         Power Transformers: With capacities ranging from 5 MVA to 250 MVA and voltage classes up to 245 kV, our power transformers are available in both single-phase and three-phase configurations. We specialize in step-up (generator transformers) and step-down (autotransformers and substation transformers) solutions.

·         Oil-Immersed Transformers: We produce oil-immersed transformers up to 5 MVA and 36 kV. Our offerings encompass both hermetically sealed and conservator types, suitable for ground mounting, earthing, and specialized applications.

·         Dry Transformers: Our cast resin dry-type transformers deliver reliable performance in various environments. With capacities ranging from 100 kVA to 15 MVA and voltage classes up to 36 kV, these transformers offer safety, efficiency, and low maintenance.

 

  • ·       Busway

    Our busway solutions are engineered for efficiency, reliability, and safety.

     

    ·         Conductor Types:

    o    Power link with copper conductor

    o    Spine with aluminum bi-metal conductor

     

    ·         Current Ratings:

    o    Copper conductor: 800A to 6300A

    o    Aluminum bi-metal conductor: 800A to 6300A

     

     

    ·      Fiber Glass Poles

Elsewedy Electric offers a wide range of high-quality fiberglass poles, renowned for their durability, lightweight nature, and exceptional corrosion resistance. These poles find applications across various sectors:

o    Standard Fiber Glass Poles

o    Smart Fiber Glass Poles

 

  • IPP Renewable Projects: With a strong track record in renewable energy, we are actively contributing to Saudi Arabia’s target of 50% renewable energy generation by 2030. Our expertise spans solar, wind, and other renewable technologies.

 

 

  • Engineering & Construction: We build the essential infrastructure for a modern grid, including substations, transmission lines, and distribution networks. Our expertise also extends to constructing vital community assets such as hospitals, schools, and world-class stadiums.

 

 

  • Digital Solutions:

Elsewedy Electric offers a comprehensive suite of digital solutions to drive operational efficiency, enhance communication, and secure critical infrastructure. Our expertise spans:

·         Unified Communications

·         Wireless Networks

·         Network Infrastructure

·         Cybersecurity

·         IoT and Smart Solutions

·         Managed Services

 

 

 

  • Data Centers & Telecom Solutions: Beyond traditional power solutions, we offer cutting-edge data center and telecom infrastructure to drive digital transformation and economic growth.

 

News Room

ELSEWEDY CABLES KSA: POWERING SUSTAINABLE DEVELOPMENT AND GROWTH

Nov-2023

Elsewedy Cables KSA, a subsidiary of Elsewedy Electric, is a leading cable supplier in the Kingdom of Saudi Arabia. The company has a strong track record of delivering high-quality cables and services to a wide range of projects, including the following:

  • Neom’s The Line Project: Elsewedy Cables has been awarded a contract to supply low-voltage and medium-voltage cables for Neom's the line project, a 170-kilometer-long, 500-meter-tall linear city under construction in Neom. This contract further strengthens the partnership between Elsewedy Electric and Neom, contributing to sustainable development and attracting investments.
  • King Salman Medical and Educational City Project: Elsewedy Cables KSA has participated in the supply of low-voltage and medium-voltage cables for the construction of the King Salman Medical and Educational City project in Al-Mahra governorate, Eastern Yemen. The project is funded by the Saudi program for development and reconstruction of Yemen, in partnership with the main contractor, Al-Bawani company. The King Salman Medical and Educational City project aims to enhance healthcare and education infrastructure in Al-Mahra governorate.
  • Al-Diriya Gate Project: Elsewedy Cables KSA has announced a strategic partnership with Al-Diriya Gate and Al-Rashed Contracting for the supply of medium-voltage cables in the Al-Diriya Gate Project in Riyadh. The Al-Diriya Gate Project aims to create a unique and comprehensive community in Riyadh, encompassing recreational, cultural, and historical facilities. To ensure the necessary electrical connectivity for these facilities, Elsewedy Cables KSA has collaborated with Al-Diriya Gate and Al-Rashed contracting to supply medium-voltage cables and the required accessories.
  • Jafurah Project: Elsewedy Cables KSA's success in supplying cables for the Jafurah project exemplifies their strong partnership with Saipem and their position as a trusted supplier to Aramco. Their commitment to quality, expertise, and timely delivery has solidified their role as a key partner in the project's success. It highlights our position as a trusted partner to Aramco for over 15 years.
  • Red Sea Project: Elsewedy Cables KSA takes great pride in its position as a leading cable supplier, catering to various types of cables for the red sea project, especially Shura Island. This achievement is made possible through collaboration with Al-Futtaim and Elginca International, and the project is considered one of the kingdom's significant tourism ventures. High-quality cables have been provided to support the island's modern infrastructure and systems, contributing to the realization of the project's vision and establishing it as a distinctive tourist destination.

These projects demonstrate Elsewedy Cables KSA's commitment to supporting sustainable development and growth in the Kingdom of Saudi Arabia. The company's wide range of products and services, combined with its expertise and experience, make it a valuable partner for projects of all sizes and complexities.

ELSEWEDY ELECTRIC & JINKO POWER ALLIED TO ASSIST KSA REACH NET-ZERO EMISSIONS BY 2050

Sep-2023

ELSEWEDY ELECTRIC for Transmission and Distribution (EETD), a subsidiary of ELSEWEDY ELECTRIC (EE), has inked an EPC contract with Al-Ghazala Energy Company, the KSA-based subsidiary of Jinko Power Technology Co., Ltd. (SSE 601778) for the 300 MW Saad Photovoltaic (PV) Solar Independent Power Producer (IPP) Project in the Kingdom of Saudi Arabia. Through this full-wrap turnkey pact, ELSEWEDY ELECTRIC’s subsidiary shall competently manage the design, supply, and construction works and perform the operation and maintenance for the initial years.

Empowering Better Lives since 1938, EETD was meticulously chosen by the renowned IPP developer, Jinko Power, to reduce Riyadh's CO2 emissions by more than 0.5 million metric tons/year.  Located 85 km (about 52.82 mi) to the east of Riyadh City, the Saad Project is the part of Category B projects under the third round of competitive tenders of Saudi Arabia's National Renewable Energy Programme (NREP). 

Eng. Ahmed El Sewedy, President and CEO of ELSEWEDY ELECTRIC (EE) stated: “Cementing our sustainable endeavors towards the global clean energy transition, ELSEWEDY ELECTRIC Group (EE) is honored to play a pivotal role in realizing The Saudi Vision 2030. By meeting 50% of KSA's power needs with renewable energy and ultimately reaching net-zero emissions by 2050, EE has successfully entrenched its strict compliance with internal environmental, social, and governance (ESG)'s codes, and greatly contributed to the sustainable liability of its esteemed clients, partners, and society.”

Eng. Medhat Maher, CEO of ELSEWEDY ELECTRIC for Transmission and Distribution (EETD) commented: “Leveraging our world-renowned EPC and O&M capacities, EETD is privileged by playing a leading role in the implementation of KSA's Saad 300 MW PV power plant. In line with ELSEWEDY ELECTRIC’s (EE) corporate strategy of becoming one of the world's top-notch pioneers in delivering energy, services, and value, while adhering to green energy transformation, EETD's ingenious team in KSA shall build, operate, and maintain such state-of-the-art solar power generation facility, and dexterously connect it to the national power grid to generously contribute to Saudi Arabia's power supply."

Thanks to its wealthy heritage and witnessed dedication to preserving the environment, ELSEWEDY ELECTRIC (EE) has been long elected by the world's energy leaders as a distinguished partner of choice. With a solid creed that Sustainable Development Leads to a Greater Future, EE has been crowned by TUV-Nord Germany as the first Egyptian, African, and Middle Eastern company to obtain ISO 14067 for the carbon footprint. Optimizing the science-based targets and climate change mitigation strategy to reach net zero by 2050, EE takes pride in being the first Egyptian corporation to report on the environmental, social, and governance criteria (ESG), along with the Carbon Footprint, in their sustainability report.

Contact Us
ELSEWEDY ELECTRIC KSA Head Quarters

ELSEWEDY ELECTRIC KSA Head Quarters

Address

No. 8162, King Fahad Branch St. 7th Floor, 3701 Al Olaya District P.O. Box 12313 Riyadh, Kingdom of Saudi Arabia




Request Service

MAKE A QUERY