Power Generation (Morro bento)

Engineering, procurement, construction and Commissioning of three thermal power plants with total capacity of 150 MW In CAMAMA, MORRO BENTO and HUAMBO on EPC+F basis as part of Angola emergency power plan

By using 6 units of GE- TM2500+  generation 7:

·       Client: Ministry of Energy and Water (MINEA)

·       Generating 150 MW

·       Connected to Grid in 10 Months

·       Project Value: USD 484 Million

·       In operation since 2018