220kv Overhead Transmission Line (OHTL) 53km + 220/33/11 kV Gas Insulated Substation (GIS)

Location: Tunisia 

Year: 2018

Project Operation: Supplied and installed 52 km of 220 kV overhead transmission line (OHTL) and constructed a 220/33/11 kV gas-insulated substation (GIS).